Two lists that travel with the portfolio. The first is every claim that still needs an evidence gate before it is spoken loosely. The second is material that was deliberately kept out of the portfolio and belongs in an NDA room.
97 identified invention themes / patent candidates
Slide 20 — IP & Defensibility
Risk. The count can be read as a patent portfolio if the qualifier is dropped in conversation.
Required. Internal invention-theme register, counsel review, and a decision on which themes remain candidates vs. trade secret.
SPORTIX Padel Sensor as a physical evidence node
Slide 12 — Sensor Innovation
Risk. Readers may infer a manufactured, certified product.
Required. Engineering specification pack, BOM hypothesis, lab protocol. Do not present samples as products until they exist.
Three-level football sensing architecture (schools / academies / pro)
Slide 10
Risk. May be heard as already instrumented across those environments.
Required. Pilot designs, capture-quality benchmarks, and a written policy that schools stay camera-first.
Computer vision loop including pose/action and confidence
Slide 11
Risk. May be heard as production-grade models already trained and promoted.
Required. Benchmark plan, calibration protocol, field-validation gates before any production promotion.
ENTRY_VERIFIED from authorised ticketing / access-control
Slide 14
Risk. Implies integrations with ticketing vendors that are not contracted.
Required. Named integration targets under NDA; no public vendor claims until agreements exist.
Cultural Passport / Experience Map
Slide 15
Risk. May be heard as a live consumer product.
Required. Prototype evidence and a destination pilot design.
Revenue engines (subscriptions, marketplace, sponsorship, B2G)
Slides 17–18
Risk. A designed map can be mistaken for current revenue.
Required. Keep language as designed architecture. Introduce figures only from a financial model under NDA.
Phase 4 potential B2B security commercialization
Slide 16
Risk. May be modelled as near-term security ARR.
Required. Keep Phase 4 gated. Do not put it in a base-case revenue build.
Relevance to Vision 2030 and World Cup 2034 readiness
Slide 23
Risk. Can be misread as official government alignment or endorsement.
Required. Use only the qualified language in the portfolio. No ministry, federation or 2034 marks without evidence.
SPORT ID as a continuity layer from school to national team
Slides 8–9
Risk. Implies institutional write-access and data-sharing that does not yet exist.
Required. Data-governance design, consent model, and pilot institutions before any public continuity claim.
Governed AI services as a commercial interface
Slide 05
Risk. May be heard as an existing API product.
Required. Service catalogue remains target architecture until a versioned interface exists.
Native sponsored posts inside the SPORTIX feed
Slide 17
Risk. Implies a live audience and an ads stack.
Required. Do not present media-kit numbers until there is a real feed and a real audience.
Patent claim charts, draft claims and invention disclosures
Public disclosure can destroy novelty. Candidates are mentioned; charts are not.
Model architectures, weights, training recipes and evaluation sets
Core know-how. Belongs in a technical diligence room, not a travelling portfolio.
Sensor fusion algorithms, calibration constants, UWB/LPS layouts
Trade secret. The portfolio shows the sensing philosophy, not the method.
Named target partners, federations, clubs, venues or ministries
Until evidenced, names create implied endorsement and relationship risk.
Full financial model, cap table, use-of-proceeds detail
Lives with the pitch and the data room, not in this architecture portfolio.
Security control catalogues, threat models, pentest results
Useful in diligence; harmful if published ahead of a control environment.
Personal data schemas, athlete minors policy drafts, consent ledgers
Sensitive by nature. Summarise the principle; share the policy under NDA.
Unreleased prototype recordings, athlete footage, visitor traces
Likeness and privacy. No operational evidence is faked or pasted into this deck.
Vendor shortlists (ticketing, cloud, GNSS, insole, camera OEMs)
Commercial sensitivity. Architecture is shown; suppliers are not.
Detailed 98-component product catalogue
Overwhelms the reader and leaks roadmap. Selected families are enough.